Contact us
Case study · Duque de Caxias / RJ

CD Rio de Ouro 2 — distribution center in Duque de Caxias (RJ)

Architectural design and construction of a 21,179.59 m² distribution center in Duque de Caxias, delivered in 12 months.

The development

CD Rio de Ouro 2

CD Rio de Ouro 2 is a distribution center in Duque de Caxias, in the Rio de Janeiro metropolitan area, with 21,179.59 m² of built area on a 52,907 m² site. The warehouse has 20 loading docks and a three-story office block.

Duque de Caxias, crossed by the Washington Luís Highway (BR-040) and the Arco Metropolitano, is one of the state's main logistics hubs and accounts for 17 of the 30 projects in the MM Obras portfolio.

CD Rio de Ouro 2 — distribution center in Duque de Caxias / RJ, a project by MM Obras
CD Rio de Ouro 2 — Duque de Caxias / RJ
Fact sheet

Project data

Project
CD Rio de Ouro 2
City
Duque de Caxias / RJ
Type
Distribution center
Built area
21,179.59 m²
Land area
52,907 m²
MM Obras scope
Architectural design and construction
Construction system
Steel structure; insulated standing-seam metal roof; metal cladding over a concrete block base wall; continuous flight auger pile foundations; industrial concrete floor.
Delivered
2019
Duration
12 months
Gallery

Project photos

MM Obras’ role

Architectural design and construction

On this project, MM Obras was responsible for the architectural design and the construction — from the warehouse concept to delivery ready to operate.

The works were contracted on a cost-plus (management) basis: MM Obras planned, coordinated, monitored and supervised every stage of construction, from March 2018 to March 2019.

A steel structure, an insulated roof and an industrial concrete floor were specified for the performance of the logistics operation, with dock levelers and a sprinkler system.

Solutions applied to this project

Logistics, industrial and airport architecture: projects from initial concept to legal approval, with rationalization and construction efficiency. Architecture is where the site layout, modulation, docks, yards and flows are defined — decisions that determine construction cost and operational performance throughout the warehouse's service life.

Construction: construction rationalization and industrialized building systems that optimize execution and reduce schedules and costs without compromising quality, with control of quality, cost and schedule from start to delivery.

MM Obras works as a partner at every stage of the development — land consulting, architecture, real estate structuring and construction. Each solution can be hired on its own or as part of an integrated scope, with a single point of contact from land to delivery.

Explore the solution: warehouse construction

Portfolio

Other projects

View full portfolio
CD L'Oréal — Duque de Caxias / RJ
Duque de Caxias / RJ

CD L'Oréal

75,000 m² built285,000 m² of land
Condomínio Logístico BZLog — Duque de Caxias / RJ
Duque de Caxias / RJ

Condomínio Logístico BZLog

100,780.56 m² built509,000 m² of land
CD King Ouro — Duque de Caxias / RJ
Duque de Caxias / RJ

CD King Ouro

32,437.25 m² built144,720.44 m² of land
Contact us

Let’s talk about your development

Talk to MM Obras