CD CLRG Galeão — distribution center in Rio de Janeiro (RJ)

Approval, detailed design and construction of a 20,960.54 m² distribution center in the Galeão Airport complex.

The development

CD CLRG Galeão

CD CLRG Galeão is a distribution center in Rio de Janeiro, in the cargo terminal yard of Tom Jobim International Airport (Galeão), with 20,960.54 m² of built area on a 30,000 m² site and 40 loading docks.

Its location inside the airport complex brings storage close to air cargo — a type of development that also requires approvals from the airport concessionaire and the Brazilian Air Force.

CD CLRG Galeão — distribution center in Rio de Janeiro / RJ, a project by MM Obras
CD CLRG Galeão — Rio de Janeiro / RJ
Fact sheet

Project data

Project
CD CLRG Galeão
City
Rio de Janeiro / RJ
Type
Distribution center in an airport area
Built area
20,960.54 m²
Land area
30,000 m²
MM Obras scope
Approval support, detailed design and construction
Construction system
Precast concrete columns on precast piles; steel-framed roof with insulated standing-seam panels; concrete block and metal panel cladding; industrial concrete floor.
Delivered
2023
Duration
13 months
Gallery

Project photos

MM Obras’ role

Approval support, detailed design and construction

MM Obras supported the approval and licensing process with Rio de Janeiro City Hall, the airport concessionaire and other agencies, developed the detailed design and built the warehouse.

Construction was carried out under a cost-plus contract with a guaranteed maximum price, from June 2022 to July 2023.

The building system combines precast concrete columns, a steel-framed roof with insulated standing-seam panels and an industrial concrete floor — industrialized solutions that shorten schedules without compromising quality.

Solutions applied to this project

Logistics, industrial and airport architecture: projects from initial concept to legal approval, with rationalization and construction efficiency. Architecture is where the site layout, modulation, docks, yards and flows are defined — decisions that determine construction cost and operational performance throughout the warehouse's service life.

Construction: construction rationalization and industrialized building systems that optimize execution and reduce schedules and costs without compromising quality, with control of quality, cost and schedule from start to delivery.

MM Obras works as a partner at every stage of the development — land consulting, architecture, real estate structuring and construction. Each solution can be hired on its own or as part of an integrated scope, with a single point of contact from land to delivery.

Explore the solution: warehouse construction

Portfolio

Other projects

View full portfolio
Terminal de Cargas Cargo Park — Rio de Janeiro / RJ
Rio de Janeiro / RJ

Terminal de Cargas Cargo Park

150,000 m² built1,000,000 m² of land
CD L'Oréal — Duque de Caxias / RJ
Duque de Caxias / RJ

CD L'Oréal

75,000 m² built285,000 m² of land
CD Casa e Vídeo — Queimados / RJ
Queimados / RJ

CD Casa e Vídeo

66,500 m² built190,000 m² of land